Most plants have a lockout binder. The harder question is whether a mechanic on nights could find the procedure for the press in front of them, and whether it names every energy source. A lockout tagout program protects people only when it matches the machines on the floor and how crews service them.
As of October 2026, OSHA's posted preliminary list of the most frequently cited standards for fiscal year 2026 (October 1, 2025, to August 31, 2026) ranks Control of Hazardous Energy (lockout/tagout) third.
Table of Contents
The rule is 29 CFR 1910.147, The control of hazardous energy (lockout/tagout). It covers servicing and maintenance where unexpected energization, startup or release of stored energy could injure employees. Paragraphs (a)(1)(ii) and (a)(2) leave out:
Under (c)(1), the employer must "establish a program consisting of energy control procedures, employee training and periodic inspections" so that, before servicing, the machine is isolated from its energy source and rendered inoperative.
Servicing is broader than most crews assume. Its definition includes adjusting, inspecting, lubricating, cleaning, unjamming and tool changes when they expose workers to unexpected startup or hazardous energy. A sanitation crew cleaning a conveyor can be doing covered work.
Under (c)(2), a device that can be locked out gets lockout. Tagout is allowed there only if the employer shows full employee protection under (c)(3): the tag sits where the lock would, every tagout provision is met, and added measures such as removing a valve handle match lockout's safety. Under (c)(2)(iii), after January 2, 1990, isolating devices on newly installed machines, and on machines that undergo replacement or major repair, renovation or modification, must be designed to accept a lockout device.
Paragraph (c)(4)(i) says: "Procedures shall be developed, documented and utilized for the control of potentially hazardous energy" during covered work.
Under (c)(4)(ii), procedures must "clearly and specifically outline the scope, purpose, authorization, rules, and techniques" for controlling hazardous energy and the means to enforce compliance. They include at least:
| Element | What to write for each machine | Paragraph |
|---|---|---|
| Intended use | The machine and servicing tasks the procedure covers | (c)(4)(ii)(A) |
| Shutdown and isolation | Steps to shut down, isolate, block and secure, naming each energy source and its isolating device | (c)(4)(ii)(B) |
| Devices | Steps to place, remove and transfer locks or tags, and who is responsible for them | (c)(4)(ii)(C) |
| Verification | How to test the machine to verify that locks, tags and other measures work | (c)(4)(ii)(D) |
Write procedures at the machine, not at a desk. The usual gap is an unlisted energy source, such as a second electrical feed or a hydraulic line holding pressure. Walk each machine with the people who service it, and label isolation points to match. Inspectors ask the same of a written HazCom program: does the document match the floor?
Under the (c)(4)(i) exception, the employer need not document a procedure for a machine when all of these elements exist:
The exception removes the duty to document, not the duty to lock out. Record which machines fall under it and why each condition holds.
Under (c)(5)(i), the employer provides locks, tags and other hardware. Under (c)(5)(ii), devices must be singularly identified, must be the only devices used for controlling energy, must not be used for other purposes, and must be:
Before devices come off and energy is restored, the authorized employee checks that nonessential items are removed, components are operationally intact and all employees are safely positioned or removed, under (e)(1)-(e)(2). Once devices are off, affected employees are notified before the machine starts.
Under (e)(3), each device is removed by the employee who applied it. If that employee is not available, the employer may direct removal under specific procedures and training documented in the program, and must show the procedure is as safe as removal by that employee. The procedure verifies the employee is not at the facility, makes all reasonable efforts to tell them the device was removed, and ensures they know before they resume work there.
When a machine must be energized temporarily, (f)(1) sets the order: clear tools and materials, remove employees, remove devices under (e)(3), energize and test or position, then deenergize all systems and reapply controls.
Under (f)(2)(i), the on-site and outside employers must inform each other of their lockout or tagout procedures. Under (f)(2)(ii), the on-site employer must ensure its employees understand and comply with the outside program's restrictions and prohibitions.
When a crew or other group does the servicing, (f)(3)(i) requires protection "equivalent to that provided by the implementation of a personal lockout or tagout device." Under (f)(3)(ii), one authorized employee has primary responsibility for a set number of workers and a way to check each member's exposure status.
With several crews or crafts, one authorized employee coordinates them and ensures continuity of protection. Each authorized employee puts a personal device on the group device or lockbox when they begin work and removes it when they stop.
Paragraph (f)(4) requires specific procedures during shift or personnel changes to keep lockout or tagout protection continuous, including the orderly transfer of devices between off-going and oncoming employees.
Paragraph (c)(6)(i) requires the employer to "conduct a periodic inspection of the energy control procedure at least annually" to ensure the procedure and the standard are being followed:
Under (c)(6)(ii), the employer certifies each inspection, identifying the machine, the date, the employees included and the inspector.
Our EHS compliance article lists the periodic inspection among audits some standards build in.
Paragraph (c)(7) sets training for authorized, affected and other employees, ties retraining of authorized and affected employees to events such as changed procedures or gaps found at inspection, and requires certification. See lockout/tagout training for those duties.
The weak point sits between inspections, on machines serviced so rarely that crews last used the steps months ago.
Blank Slate is a cognitive-readiness platform built on AI-optimized spaced retrieval, which combines spaced repetition (reviewing material over time) with retrieval practice (answering from memory instead of rereading). It works on top of the training content your organization already has. Employees answer questions in short sessions (about 60 seconds), 3-4 times a week, adding up to a few minutes a week. True Knowledge Level™, Blank Slate's real-time readiness metric, shows what a person or team knows now (how it works).
US Air Force pararescue trainees rose from 67% to 81% accuracy over 16 weeks while averaging about 100 seconds of use per week (I/ITSEC 2023). In a year-long case study, data-center security guards who started below their team's median rose from about 56% to over 90% accuracy (Smith, MODSIM World 2025). They used three short sessions a week, six questions each. Neither study measured energy control knowledge; both show accuracy gains from brief weekly practice.
Blank Slate does not replace any part of a lockout tagout program. It does not write procedures, perform inspections, deliver (c)(7) training or certify anything. It reinforces and measures what employees retain between those events and coexists with your LMS (see the difference).
Pick three machines: one serviced daily, one serviced rarely, one on group lockout. Compare each procedure to the crew's practice, and ask authorized employees to name every energy source from memory. For the knowledge half, request a Knowledge Gap Audit: it shows what the team knows today, where gaps may exist and where to focus first. See how Blank Slate supports industrial safety teams.
No. Under 1910.147(c)(4)(i), a machine needs no documented procedure only when all eight conditions hold, including a single readily isolated energy source, no potential for stored or residual energy, and no accidents from unexpected activation or reenergization while using the exception. The machine must still be locked out.
Each energy control procedure is inspected at least annually under 1910.147(c)(6)(i), by an authorized employee other than the one(s) using it. Lockout inspections review each authorized employee's responsibilities; tagout inspections also include affected employees. The employer certifies each inspection.
The employee who applied it, under 1910.147(e)(3). If that employee is not available, the employer may direct removal under a documented procedure, with training, that is as safe as removal by that employee. The procedure verifies they are not at the facility, makes all reasonable efforts to tell them the device was removed, and ensures they know before resuming work there.
A lockout tagout program is tested every time someone opens a guard. A Knowledge Gap Audit gives you a one-page readiness snapshot of what's retained, what's slipping, and where to reinforce first.